Welcome To Bridge Racing. Record Breaking Mod Motors - First In The 7's With A Mod Motor On Drag Radials (4.6L & 5.4L) - 2008 NMRA Drag Radial National Record Holders -  Home of the First 180 mph NMRA Drag Radial Car -  We Are Located At 2989 Stateline Road West.  Southaven, Mississippi (Near Memphis,TN).


 

Products/Store

Services

Projects/Customers

Race Team

Updated Forum

Turbo Systems

Engine Room

Roll Cages

Chute Mounts

Tubs

Fabrication

Suspension

Intake Manifold

Wiring Services

Custom Exhaust

Donate

Media/Articles

Sponsors

Go Fast Links

Policy/Statement

Contact/Hours

Home

 Twin Turbo Drag Radial Mustang Build.

Bridge Racing will be constructing the complete hot and cold side for Jim Mills '95 Cobra.

Here is a list of the parts we will be using:

2 Precision GT47-88 Turbo's

2 New Gen. Wastegates

Procharger Blow-Off valve

Precision PT-3000 Intercooler

V Band clamps on everything

321 Stainless on the Headers/Hot Side


Jim Mills Testing at NMCA(Memphis)-Click On Photo Below For Video

 


Jim Mills '95 Cobra in for a complete Twin 88mm Turbo Setup

The engine bay we will be playing with.

Engine Bay.

Marvin & Joey dummy up one of the GT4788 Turbo's

getting the passenger side turbo where we want it.

the general location of where the twins will live.

Getting the turbo's where they need to be.

Getting the turbo's where they need to be.

Marvin starting on the Headers/Hot Side

Headers/Hot Side

Passenger side header

Passenger side header

Driver's side header

Driver's side header

driver's side header

making the turbo exhaust flanges

turbo exhaust flanges

welded turbo exhaust flange

hot side (passenger)

hot side (passenger)

hot side

hot side.

starting on the dump pipes

dump pipes

dump pipe (driver's side)

dump pipe's

dump pipe's (5 inch - 4 inch transition)

dump pipe (dummy up)

we had to mate a 90mm elbow to a 105mm throttle body so it was time to start machining

Marvin welding up the converted 90mm to a 105mm elbow.

finished with the 90mm to 105mm elbow conversion.

Joey finishing up the firewall plates for the ducting

throttle body & elbow.

mounting of the PT3000 intercooler keeping in mind that there will be a passenger seat.

mounting of the PT3000 intercooler

starting on the cold side ducting

starting on the cold side ducting

Intercooler to throttle body ducting

starting on the cold side ducting pre-intercooler

cold side ducting pre-intercooler

new seat mounted.

welding of the blow-off tubing

getting there with the cold side

cold side.

cold side.

getting it all togeather.

cold side plumbing

We had to make reducers for the 4 inch ducting to fit the GT4788's

welded reducer

reducer in place so the 4 inch ducting fit's the GT4788

blow-off valve tubing

blow-off valve tubing

Blow-off valve mounted

finishing up the cold side plumbing (pre-intercooler)

making a header tank for the radiator

header tank

mounting the wastegates

wastegate's going in

wastegates in there new home

Radiator mounted and bung's welded

Radiator mounted, bung's welded

Radiator (front shot)

Fabrication work coming to an end. Time to start welding.

Passenger seat mount finished.

Passenger seat in.

Air Temp sensor bung in.

Finishing up the coolant temp, etc. bungs in radiator.

Marvin welding up the dump pipe

Setup Complete (1).

Setup Complete (2).

Setup Complete(3).

Setup Complete (4).

Setup Complete (5).

Setup Complete (6). The cars first outing will be WFC in St. Louis (April).

Car on it's first cruise.

Car on it's first cruise.

First time out: 7.88 @ 197. On 325-50-15 Radials.


 